Temporary Weekend Road Closure
To facilitate the construction of a vehicular platform from the existing SGH Emergency Department to the new Emergency Medicine Building, temporary road closure along Hospital Crescent will take effect on weekends, every Saturday from 2pm to 5am on Monday.
- Vehicles going to the SGH Emergency Dept will not be affected.
- There will be no drop-off/pick-up at SGH Block 3 including delivery services.
- Vehicles going to/from SGH Block 4, Bowyer Block Car Park C and National Cancer Centre Singapore (NCCS) will be diverted to use 3rd Hospital Avenue, along Singapore National Eye Centre (SNEC) and Diabetes & Metabolism Centre (DMC).
The footpath from Jalan Bukit Merah leading to SingHealth Tower/OCH /SGH Block 3 will also be closed to all pedestrians for safety reasons.
Look out for signage to guide drivers and pedestrians on alternative routes.
Road Network at SGH Campus
Driving to SGH and national specialty centres on SGH Campus will be through three separate, non-connecting routes. This is to improve traffic flow and ease congestion in preparation for future campus developments.
There is no changes to the pedestrian walkways.
Here's an overview of the routes (Orange,
Blue and
Purple) and where the carparks are located.
Click on the image to enlarge
Why are you implementing a destination-based road network on SGH Campus?
A destination-based road network allows motorists to get to specific destinations directly and in a shorter time, instead of having to make a loop through SGH Campus. This road network change will help traffic flow and ease any congestion that may arise with various on-going construction works on SGH Campus.
Are there more road network changes coming up?
There will not be any major road network changes on SGH Campus within the next 5 years.
Recommended route for drivers to drop-off or pick-up
View the interactive map